Ask Lasest Price | |
Brand Name : | Jianda |
Model Number : | JD-SAD |
Certification : | ISO 9001 |
Price : | for discussion |
Payment Terms : | L/C, T/T, Western Union |
Supply Ability : | 2000 rolls per day |
Delivery Time : | 10--15 work days |
Aluminum Foil Finished 1.5mm Self-Adhesive Roofing Felt Roll Membrane Non Reinforced
Introduction:
Self-adhesive modified bitumen waterproof membrane is made of modified bitumen coated with aluminum foil, PET film, HDPE film etc. Using the
latest patented tchnology, through a special process produced by the environment-friendly solvent-free sealing adhesive material. It is a quick and effective method of sealing and repairing that produces a lasting protection in all climates.
Advantage:
1.cold application, installed without the use of flames, easy to use
2.excellent mechanical properties, high bonding strength and tensile strength, good elasticity and extension performance
3.strong adaptability to the shape change and crack of the interface, and the good ability to trace the shape change of the substance
4.stable chemical peoperties, it is equipped with excellent chemical resistance, weather fastness and corrosion resistance
5. reliable application performance, excellent binding property, water resistance, leak tightness and low temperature resistance, and high stability in size
Features:
1. Aluminum foil roofing waterproofing membrane has excellent performance on ompermeability, high and low temperature flexibility, extensibility and adhesion and it can well adapt deformability cause by tensile stress on the base layer.
2.Covered with the silver Aluminum foil, the membrane has good ability to reflect the sun, which helps a lot to prevent the house from the heat and sunlight.
3.The membrane is highly resistant to puncture and has excellent self healing property, with the function of self-locking water. It has excellent adhesion bond and is convenient for construction and maintenance.
Application:
1. Before being used, the substrate must be free of any dust, dirt,
oils, moisture or debris that could interfere with proper adhesion.
Often the roof surface must be primed prior to membrane
application, with the cement adhesive bonding, width of 10 cm.
Additional layer juncture and waterproof layer juncture stagger 5
cm above.
2. Till dry for 1-2hours , use the waterproof sealant to seal all
entrance for water on the roof.
3. The basement waterproof juncture construction: the 10-15 cm lap
article cover joint way, choose agglutinate article cover polymer
adhesive.
4. Waterproofing materials lap width long side of 8-10 cm shorter
edges 10-15 cm, and the adjacent short side seams shall be more
than 10 cm stagger angle metope and ground in for 30 cm above all.
color | silver |
upper surface | aluminum foil |
lower surface | release film |
material | modified bitumen |
thickness | 1.5mm, 2mm |
roll size | 20m, 15m |
roll coverage | 20m2, 15m2 |
Friendly Links: www.everychina.com
Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Contact Us |Help |关于我们 |联系我们